The investment involves the complete reconstruction of the 220/110 kV Glinki electrical substation, located on Szosa Polska Street in Szczecin, in the West Pomeranian Voivodeship (see map or GPS 53°30’00.1″N 14°34’53.3″E).
The scope of work includes:
Dismantling of the existing substation equipment
Reconstruction of the substation building
Reconstruction of cable ducts
Connection and commissioning of new substation equipment
Development of fire protection, stormwater drainage, and sewage infrastructure
The reconstruction of the 220/110 kV Glinki electrical substation is a supra-local investment with a significant impact on improving the operation of the power infrastructure, minimizing the risk of critical system failures to the greatest extent possible.