GDDKiA Opole
307,440,000 PLN / 73,200,000.00 EUR
(1 EUR = 4.20 PLN)
08/2014 – 10/2017
The completed Nysa Bypass consists of 16.5 km of new national roads, including 7.4 km of a dual carriageway section of DK 46 and 9.1 km of a single carriageway of DK 41, of which 4 km were constructed in a 2+1 layout.
The project included construction of 14 bridge structures, including a 383-meter bridge over the Nysa Kłodzka River, featuring a 100-meter main span and 2 structures over existing railway lines connecting Nysa to Brzeg and Nysa to Opole. The investment also includes building 5 road intersections, 4 medium-sized roundabouts, access roads to agricultural properties, running parallel to the bypass and 10 retention and infiltration-retention reservoirs.