S17 Skrudki – Sielce

Project Details

TASK

The project involved the construction of an expressway on the section between the “Skrudki Interchange” (excluding the interchange) and the “Sielce Interchange,” now called “Kurów Zachód” (excluding the interchange), along with engineering structures and associated infrastructure

SECTION LENGTH

Approx. 13.17 km

CONTRACT VALUE

270,000,000 PLN / 64,285,714.29 EUR
(1 EUR = 4.20 PLN)

 

CLIENT

GDDKiA Lublin

The section runs parallel to the existing National Road No. 17, located on its southwest side.

The project involved the construction of an expressway on the section between the “Skrudki Interchange” (excluding the interchange) and the “Sielce Interchange,” now “Kurów Zachód” (excluding the interchange), along with engineering structures and associated infrastructure. The completed road section is approximately 13.17 km in length.

Technical Specifications of the Expressway:

  • Cross-section: Dual carriageway, 2 x 2
  • Technical Class: S (Expressway)
  • Design Speed (Vp): 100 km/h
  • Number of Lanes: 2 x 2 x 3.5 m (phased implementation)
  • Lane Width: 3.5 m
  • Median Width: 12.0 m (including shoulders – phased implementation)
  • Shoulder Width: 0.5 m (within the median)
  • Emergency Lane Width: 2.50 m
  • Unpaved Shoulder Width: 0.75 m (or greater if required for road safety or environmental protection features)
  • Road Crown Width (new alignment): 32.5 m
  • Traffic Category: KR7
  • Pavement Load Capacity: 115 kN/axle
  • Vertical Clearance: 5.0 m
  • Cross Slope: 2.5%