S3 Jawor – Bolków

Project Details

TASK

The project involves the construction of an expressway from the Jawor II interchange (excluding the interchange) to the Bolków interchange (including the interchange), with a length of approximately 16.105 km.

LENGTH OF THE SECTION

Approximately  16,105 km

CONTRACT VALUE

262,502,760 PLN / 61,047,153.49 EUR
1 EUR = 4.30

IMPLEMENTATION PERIOD

10/2015 – 12/2018

CLIENT

GDDKiA Wrocław

The project involves the construction of an expressway from the Jawor II interchange (excluding the interchange) to the Bolków interchange (including the interchange), with a length of approximately 16.105 km.

The scope of the project includes:

  • Construction of two interchanges: “Jawor Południe” and “Bolków”,
  • Development of a drainage system for the expressway and reconstructed cross roads, as well as newly built access and internal roads,
  • Construction of four bridges along the S3 expressway,
  • Installation of road culverts,
  • Installation of fencing along the expressway.

Technical specifications of the road:

 

  • Dual carriageway design: 2×2 lanes
  • Technical class: S
  • Design speed (Vp): 100 km/h
  • Number of lanes: 2 x 2 x 3.5 m
  • Median strip (including shoulders): Minimum 5 m
  • Shoulder width: 0.5 m
  • Emergency lane width: 2.5 m
  • Width of gravel shoulder: 0.75 m or wider if required for road safety devices or environmental protection systems
  • Traffic category: KR 7
  • Pavement load capacity: 115 kN/axle
  • Vertical clearance: 4.7 m
  • Cross slope: 2.5%