company

S3 Nowa Sól – Legnica

Project Details

Client

GDDKiA Wrocław

Implementation Period

01/2015 – 06/2018

Contract Value

261,000,000 PLN / 62,142,857.14 EUR
(1 EUR = 4.20 PLN)

The S3 expressway is part of the Central European Transport Corridor (CETC) and the European route E65, connecting Malmö in Sweden with Chania in Greece.

The 11.3-kilometer section of the S3 expressway serves as the Lubin bypass. The route has two lanes in each direction and a hard shoulder. As part of the project, two interchanges (“Lubin West” and “Lubin South”) were built, along with three viaducts, animal crossings, and hydrological-ecological culverts. The existing road network was reconstructed, and sections of the route in mining areas were secured to prevent ground subsidence.

See other realizations

Niemodlin

Niemodlin bypass

See project
Niedrzwica-Kraśnik

S19 Niedrzwica – Kraśnik

The project covers the design and construction of the S7 expressway section between the Szczepanowice and Widoma interchanges.

See project