GDDKiA (General Directorate for National Roads and Motorways)
508,135,000 PLN
The Szczepanowice – Widoma section is a dual carriageway expressway with two lanes in each direction and a reservation for a third lane. The project included two interchanges and 18 engineering structures, including a viaduct over 700 meters long, built using the incremental launching method. This structure crosses a railway line, county roads, and the Szreniawa River.