#Infrastructure
Second Lane of the Tomaszów Lubelski Bypass opened for traffic!

The main contract covered the construction of the Tomaszów Lubelski bypass along the S17 expressway linking Warsaw to Hrebenne. A 10-kilometer section of the new road was built on the eastern side of the city, along with two interchanges. The “Tomaszów Lubelski Północ” interchange was constructed at the intersection with Voivodeship Road 850, while the “Tomaszów Lubelski Południe” interchange connects to the DK17 route.
As part of the additional order, the second lane of the expressway was constructed over a 5.5 km stretch between the Węzeł W1 and Węzeł W2 interchanges.