company

#Infrastructure

#News

We will build transport corridors for CPK

We have signed a contract with the Central Communication Port company for the implementation of the task “Construction of access transport corridors for the construction of the CPK – STAGE 1” in a design-and-build formula.


The contract value exceeds PLN 75.6 million net.

 

The project includes the construction of transport corridors No. 5, 7 and 11, and optionally corridor No. 4. As part of the contract, we are responsible for:

  • preparing complete design documentation and obtaining all necessary decisions, permits and approvals, using the BIM methodology,

  • carrying out construction works, including the reconstruction of roads, intersections, culverts, wildlife crossings and the removal of conflicts with technical infrastructure,

  • installing technical equipment for roads and other engineering structures,

  • preparing as-built documentation and obtaining all approvals required for putting the investment into operation.

This is another important project for Duna Polska, strengthening our position in key infrastructure investments across the country.

You might be interested in

#Infrastructure

#News

The Jełowa–Bierdzany section of National Road DK45 has been opened to traffic

Read more

#Cubature construction

We have opened to traffic a section of the S1 Kosztowy – Bielsko-Biała expressway

Read more

#Cubature construction

#Infrastructure

#News

We will build hangars with accompanying infrastructure at the Mirosławiec airfield

Read more