#Infrastructure
#News
We will build transport corridors for CPK
The project includes the construction of transport corridors No. 5, 7 and 11, and optionally corridor No. 4. As part of the contract, we are responsible for:
-
preparing complete design documentation and obtaining all necessary decisions, permits and approvals, using the BIM methodology,
-
carrying out construction works, including the reconstruction of roads, intersections, culverts, wildlife crossings and the removal of conflicts with technical infrastructure,
-
installing technical equipment for roads and other engineering structures,
-
preparing as-built documentation and obtaining all approvals required for putting the investment into operation.
This is another important project for Duna Polska, strengthening our position in key infrastructure investments across the country.